Prior to the state of emergency declaration made by the Executive Governor of Lagos State, Mr Babajide Sawo-Olu that some selected construction companies to start work on rehabilitation as from today, you can read it here if you missed it.
However, the lists of the roads selected for urgent repairs and work has emerged.
The roads that will be rehabilitated and reconstructed include but are not limited to…
IKEJA ZONE
– Network of roads in Oregun
IKEJA G.R.A
– Network roads in Ikeja G- R- A
Badagry (from Agbara to Badagry)
– Agboju to Okokomaiko
IKORODU ZONE
– Ketu /Ojota section of Ikorodu
– Ijede road to Ewu-Elepe
– Oba Sekumade road
– Agric Isawo road
– Imota to the rice mill
EPE ZONE
– Eleko junction to T- junction at Epe
– Itoikin- Epe road
– Completion of network of road up to Noforija/ Mojoda ( existing contract )
LEKKI AJAH
– Abraham Adesanya Roundabout to Eleko
Alternative Route to Admiralty circle plaza Lekki
VICTORIA ISLAND
– Network of roads in Victoria island
– Network of roads in Oniru estate
– Water corporation drive
ABULE EGBA
– Ekoro bridge, Abule Egba
– Lagos Abeokuta expressway from Abule Egba to Sango to tollgate
MUSHIN
– Idi Oro road, Mushin
IKOYI
– Network of roads in Ikoyi
LAGOS ISLAND
– Apongbon road
– Idumagbo avenue
SURULERE
– Babs Animashaun , Surulere
BADAGRY
– Lagos Badagry expressway from trade fair to okomaiko ( existing contract) –
These are some of the roads that will be worked on immediately to reduce the stress people on these roads go through daily.
We will update you with images as we get feedbacks from various locations across the state as work begins.
(List modified as at 1.20pm this afternoon)
Leave a Reply